Delay Analysis of Base Station Flow Table in SDN-enabled Radio Access Networks

06/12/2021
by   Seyed Hamed Rastegar, et al.
0

Future generation wireless networks are designed with extremely low delay requirements which makes even small contributed delays important. On the other hand, software defined networking (SDN) has been introduced as a key enabler of future wireless and cellular networks in order to make them more flexible. In SDN, a central controller manages all network equipments by setting the match-action pairs in flow tables of the devices. However, these flow tables have limited capacity and thus are not capable of storing the rules of all the users. In this paper, we consider an SDN-enabled base station (SD-BS) in a cell equipped with a limited capacity flow table. We analyze the expected delay incurred in processing of the incoming packets to the SD-BS and present a mathematical expression for it in terms of density of the users and cell area.

READ FULL TEXT

Please sign up or login with your details

Forgot password? Click here to reset
Success!
Error Icon An error occurred

Sign in with Google

×

Use your Google Account to sign in to DeepAI

×
Pro

Consider DeepAI Pro