Delay Analysis of IEEE 802.11be Multi-link Operation under Finite Load

12/23/2022
by   Boris Bellalta, et al.
0

Multi-link Operation (MLO), arguably the most disruptive feature introduced in IEEE 802.11be, will cater for delay-sensitive applications by using multiple radio interfaces concurrently. In this paper, we analyze the delay distribution of MLO under non-saturated traffic. Our results show that upgrading from legacy single-link to MLO successfully contains the 95th percentile delay as the traffic load increases, but also that adding extra interfaces yields rapidly diminishing gains. Further experiments we conduct on Google Stadia traces, accounting for realistic traffic with batch arrivals, confirm the insights stemming from our theoretical analysis, vouching for MLO to support high-resolution real-time video with a controlled delay.

READ FULL TEXT

Please sign up or login with your details

Forgot password? Click here to reset
Success!
Error Icon An error occurred

Sign in with Google

×

Use your Google Account to sign in to DeepAI

×
Pro

Consider DeepAI Pro